fyi libvirt takes just a little over a minute to spin up a Linux build machine using copy-on-write disks (this includes waiting for SSH to come up and connect)
- Queries
- All Stories
- Search
- Advanced Search
- Transactions
- Transaction Logs
All Stories
Sep 18 2015
Sep 17 2015
That's the case for me. I like the behavior.
Hmm... This IS funny. This generally is/should be some kind of desired behaviour, but is less discoverable, because other tools don't have it, right?
Yeah, definitely surprising. I don't mind the behavior at all -- in fact, now that I know it exists, I'll probably use it intentionally. But I'm not sure how I would have known that it was intended behavior. Maybe if I was more observant and had realized that the new priority was chosen based on its location and the priority of other tags, but I feel like the UI here wasn't really discoverable.
just a heads up that I'm not actively working on this any more (have to finish other things before my contract ends.)
Last time this was discussed, @vishal proposed tweaking our current APC settings.
Would you classify it as surprising? T8135: drag & drop on a workboard sorted by priority behavior is surprising
Ah! Thank you. You can close this -- it's just user error. I had no idea that moving tasks when the work board is sorted by priority would change priorities.
Can you provide more details on how we can reproduce this bug? Do you have sorting set to Priority, for example? If sort is set to Priority, dragging cards will alter priority.
Is the workboard set to sort by priority when you are doing this?
You can also create revisions without attaching reviewers/subscribers -- this is what we do when we have commits which we also plan for more changes prior to review. Revisions also have a status of "Changes Planned" or something similar.
I just put [WIP] or [DRAFT} in my diff title to make this clear to colleagues that the diff is rough, but early feedback is wanted.
Your org has an... unusual workflow.
Revision is the the tool that is designed for pre-commit reviews; It supports all the things that you'd want from such a tool, and based on the assumption that creating a revision is not saying "this is ready to be committed", but "This is ready to be reviewed".
The workflow I was using was arc diff --preview, followed by sending a link to the diff to the colleague I wanted feedback from. In my org, creating a revision without preview is equivalent to saying "I feel confident that this code is ready to be committed to master," which isn't always the case.
Yeah, it's not clear what you're currently doing that does not have commenting. Differential has commenting, specifically for pre-commit review.
Are you using Differential to create revisions of changes prior to moving commits upstream? What you describe is essentially the workflow that using Differential is for, as far as I understand.
I also see this problem.
Anyway it is not for now !!
In T9431#137264, @epriestley wrote:Some day you'll be able to spin up a container or host per build and tear it down afterward, but doing so creates a performance/efficiency tradeoff because you have to build and tear down more state per build. I suspect this tradeoff is undesirable for this project even if the code existed to make it (because host startup / teardown would likely overwhelm build cost).
This tier now exists and rCORE knows how to deploy hosts inside it.
Right, thank you!
@dancunningham @readevalprint Also (and as a reference for anyone else
landing on this page), the actual upstream is at
https://github.com/wikimedia/phabricator-extensions-Sprint - which does
work with current Phabricator. But please do take issues up with them.
The upstream will not help you resolve issues with third-party extensions (see T5447). You need to report these issues to the extension maintainer, not here in the upstream.
I am as well. Using https://github.com/bluehawk/phabricator-sprint master at commit a5decfe154427e6edb822f29f4d08427cc6e3a60
Querying by authorPHIDs works.
This is now up, and rCORE knows how to deploy instances in this tier.
(2) would be good. Just as you note, replying to old commits is already broken anyway...
I'm not quite sure if I should expect a response (here or on IRC) before submitting some code. Or if the maniphest task is sufficient.
I think we'd likely want to pursue T8646 first and see if that resolves this on its own.
Can you suggest the best way to achieve this?
Some day you'll be able to spin up a container or host per build and tear it down afterward, but doing so creates a performance/efficiency tradeoff because you have to build and tear down more state per build. I suspect this tradeoff is undesirable for this project even if the code existed to make it (because host startup / teardown would likely overwhelm build cost).
My previous DELETE queries just reduced amount of tasks created, but I'm still getting few of those tasks.
My goal is to edit [[https://secure.phabricator.com/diffusion/P/browse/master/src/view/form/control/AphrontFormPolicyControl.php;23b2653f52cd16bc9cedfdf7328d401171e668ca$328-358 | AphrontFormPolicyControl::buildSpacesControl ]] to return null also when only default Space is remaining active.
Although builds will be isolated from services, they won't be isolated from one another. That is, anyone who can run a build can interfere with anything else happening on the same machine.
it looks like maybe Feed tried to combine the transactions, and got something wrong?
One issue that we constantly face is as follows...
Sep 16 2015
I was just filling near identical task... well here it is, copied verbatim:
D14117 discusses a vaguely related case where a blueprint might intentionally deny lease acquisition on a resource that it needs to process further. This pattern seems fine conceptually if/when we find real resources in the wild which fit into it.
This block has been removed in D14114 and we no longer distinguish between "lost an allocation race" and "all resources are currently full". The logic goes:
I think there are two components to this:
See T9427 for the C... issue.
Countdown and Audit both use the C prefix after D13713, so C123 matches both "Countdown 123" and "Commit (with internal ID) 123".