I'm using the Sprint Plugin. It works well for story points. But it's nonintuitive that the Story Points of the subtasks are not added up automatically to become the story point of the main task.
What I would expect is
Task 1
Sub Task 1 - 5 points Sub Task 2 - 4 points
Task 1 automatically gets 9 points.
If Task 1 has any manually entered points, this might be handled in two ways
- add it to the calculated story points
- use that as a way of overriding the auto story point feature. So if the story points of a task are manually entered then the auto calculation won't happen