We have some sub-projects which are mapped to "products" which are sub-projects of a given team. We'd like to be able to move products between teams as re-organizations occur. It is possible to do with a batch edit, but this involves lots of manual work (creating a new project, copying the workboards, batch editing the switch, and repositioning within the column.
There exists a script which works for flat projects but this requires ssh access to the host and is not a scalable solution.